views
· Shovel the wet concrete into the formed section, and fill the section to the covers of the forms. Use a 4- bottom-long piece of pressure-treated two-by-four as a screed board to position the wet concrete. Hold the board on edge atop the forms at one end of the section and sluggishly drag it across the face of the concrete toward the contrary end of the section. Remove any redundant concrete with the shovel.
Concrete contractors Brooklyn NY
Residential sidewalk contractors near me
· Smooth the face of the fresh concrete with a wooden pier. Fit the twisted edge of the tool into the confluence between the concrete and a form and use long, indeed strokes with the tool for stylish results.
Email: rconstructionny@gmail.com
Contact Us: 718-971-4362
Address: 6513 17th Ave Brooklyn NY 11204
· Smooth the face of the fresh concrete to an invariant finish with a sword trowel. Produce control-common lines where the fresh concrete meets the living sections with a liner tool. Use medium pressure with the tool to avoid fleecing the face of the new sidewalk.
· Remove any concrete debris from the section. Grade the dirt where the concrete was removed to an invariant face with a sword rake.