menu
Pouring and Finish
Obviously, we work with both residential and commercial clients, providing necessary repair work.

·         Each end of a form extends past the matching end of the conterminous sidewalk section 24 elevations. Cut the two-by-fours with an indirect aphorism.

Concrete contractors Brooklyn NY

Masonry work Brooklyn

Concrete sidewalk contractors

Residential sidewalk contractors near me

·         Install the forms flat against the external edges of the being sidewalk with the upper edges indeed with the face of the being sidewalk.

·         Drive 12- inch rustic stakes against the external sides of the forms every 12 elevations from end to end with a sword mallet. The covers of the stakes are true with the upper edges of the forms.

Email: rconstructionny@gmail.com

Contact Us: 718-971-4362

Address: 6513 17th Ave Brooklyn NY 11204

Stage a mixing hogshead near the area of the forms. Add 1 gallon of freshwater with a theater sock. Add the correct proportion of concrete blend and an amalgamation that is specified on the permit. Turn the admixture in the hogshead constantly with the shovel and add water, as necessary, so the admixture is medium thickness rather than too dry or wet.